The Production module turns a requirement into work for the workshop. It links the articles to manufacture, their components, the process operations and the expected stock movements.

Available functions

  • create a manufacturing order for an article and quantity;
  • launch manufacturing from a sales order or planning suggestion;
  • move the order through the steps in its process;
  • pick components and put manufactured products into stock;
  • record partial declarations when production progresses in several stages; and
  • track workshop dates, quantities and progress.

Prerequisites

Before launching an order, prepare:
  • the article to manufacture and its unit;
  • its production process and steps;
  • its bill of materials when components are consumed;
  • the production site and stock locations used; and
  • the required times or capacities if you use scheduling.

Production lifecycle

1

Identify the requirement

Start from a sales order, a planning suggestion or a requirement to replenish stock.
2

Create the manufacturing order

Select the article, quantity, process, site and expected date.
3

Prepare the components

Check their availability, then reserve or pick the lots required by the process.
4

Declare the operations

Move the order through each step. Use partial declarations when the complete quantity is not processed at once.
5

Complete manufacturing

Put the manufactured products into their location and check the consumed and produced quantities.

Points to check

  • An incomplete bill of materials produces incorrect requirements and picks.
  • The process defines the steps, tasks and stock movements.
  • A realistic expected date improves planning and scheduling proposals.

Plan requirements

Decide how much to manufacture and when to launch it.

Manage stock

Track consumed components and manufactured products.

Schedule the workshop

Assign operations to machines and available time slots.